I showed up late Friday afternoon, not expecting to get anything done that day but to be able to start almost at sunrise on Saturday. John came out the night before with the intention of imaging but he got clouded out. As it turned out Friday night got clouded out too and by 9 PM we were totally fogged in. It was so dark that if you stepped outside and took only a couple of steps and turned around, you could not see the observatory. A white door light less than fifty feet away did not even make a pale glow - it was completely invisible. We were fortunate because we recently added some things to the place to make it more comfortable. We now have a 36 inch flat screen TV (temporarily until I get a deal on a 46 inch one), a BlueRay player,and a microwave. So we ate popcorn, drank beer, and watched "When Worlds Collide" (one of the few good sci-fi movies from the '50s - and in color) then "2012" before we packed it in. I was able to bunk out in my room which is almost finished, and John slept in his warm room on the observing deck (which is almost completed also). At sunrise the cloud deck was less than several hundred feet up and quite thick, plus it was damp and only in the 50s. As is typical in the desert, within an hour of sunrise the clouds burned off, the sky was blue, the humidity dropped like a stone, but the temps stayed in the mid-70s all day with a light breeze.
Since we had two helpers showing up around 10 AM we were able to work on multiple projects at the same time. John double checked his autocad drawings for the rail and post support measurements while I went to work on what was left of the wood mold on the footings. If you remember, we struggled with that during the winter and decided to back off until the weather got warmer. Here's the east footing and the remaining wood mold:
I was pleasantly surprised because the wood had dried out so much over the winter that I was able to cut it easily and then break it out of the concrete with a sledge hammer. What I thought was going to be a several hour job turned out to be about thirty minutes. When I got the mold off the east pier I found that we had a neighbor:
The only reason I got such a close shot of him was because it was still pretty cool out and his body temperature was down so he could hardly move. Here's a shot of the north side with both footings completed and back filled.
I've just gone to live time now - at 9:26 PM on Monday evening as I'm writing this, we just had an earthquake - house gently swayed for about 15 seconds, pool water is rocking back and forth and almost overflowing - USGS just reported a 5.7 magnitude quake near the Mexican border, 118 miles south-southeast of here.
Okay, back to the important stuff. If your remember from last summer's blogs, I spent a lot of time sanding and priming the steel beams that we inherited from the former owners and were half buried for twenty years. We're finally starting to use them for the rail system. They're in terrific shape but many of the ends are just off being square. Here's a shot of John using a chop saw to even off the edge of one of the pieces that will be the wall cap and the base of the rail:
That particular piece is a 2 X 6 about nineteen feet long and weighs around 200 pounds. The four of us managed to lift it and one for the other side up onto the roof. Once it was up on the roof and precisely positioned, we closely adjusted its level and extended it beyond the north roof line and over the west footing. John then hung a line down to where the post will attach to the top of the footing. The picture below shows John and his friend Roger taking some measurements. Derek is on the roof.
The measurement indicated that we were within 1/8 inch of our planned height. The other footing showed the same small difference. We were able to cut our lone 2 X 8 into the right lengths for both posts. Here's John cutting the 2 X 8:
One of the things that we have to do also that sounds minor but takes time is beveling the edges of the steel. That is to allow more contact area for when we butt the beam ends and have to weld them together. In the photo below, both posts are cut and stacked and you can see bright steel on their edges from the bevel grinding that we did.
Actual measurement and cutting of the two rail posts were the major goals for the weekend. This gives John the information he needs to cut additional small steel plates and supports over the following, or current, week at home. Here is a picture from a different angle of the rails put in place for the post measurement:
While these measurements were going on I was on the observing deck doing the very last of the demolition. We had left the 2 X 6 wood caps on the east and south walls through the winter and now they had to be removed to be able to place the rail system. They were originally bolted to the top of the cinder block wall with the nuts recessed into the 2 X 6. We couldn't figure how they originally screwed the nuts onto the bolts because there was virtually no room to get a socket wrench around the nut. I had to chisel some of the wood away to get enough room to work with. The picture below shows the observing roof area from last summer with all of the steel and wood support we had to remove. Compare that to the following picture taken last Saturday from a soemwhat different angle. You can see that the demo has been completed down to the cinder blocks. The bolts sticking up out of the wall need to be cut and then that wall is ready for the rail. This is also a good picture to show the observing area that I will be using. My area is a bit more than 9 feet wide and 17 1/2 feet long. The permanent pier for my telescope will eventually be about where the red vacuum cleaner is sited.
We had another adventure in desert biology. We took a break about 1 PM for lunch and sat around the front door of the observatory in front of my car. As we were eating, a five foot king snake slithered quickly across our driveway under the trunk of my car - no more than fifteen feet away. I was surprised at how fast it moved - I would not have been able to outrun it. Fortunately for us, the king snake leaves peopel alone and is immune to rattlesnake venom and loves to kill and eat them.That pretty much wrapped up what we did on Saturday. We showered and went into town for dinner. By the time we got back we were getting pretty achy and tired but John went ahead and set up his equipment and automated it to image all night. I have a problem with working all day and then imaging all night so I just enjoyed the night sky for a while. It was a beautiful night with the summer Milky Way very bright and even some bright gas nebulae visible as well as the dark rift running down the center of the Milky Way. After a while I headed in and watched another '50s sci-fi classic - "Them" - yup, the one with the giant ants - and then went to sleep.
We did get interrupted with an earthquake at about 9 PM - a 4.9 twenty miles to our southeast. Things have gotten pretty active over the last year.
Sunday we got more done but we certainly were not at the pace of the previous day. We mostly policed the area around the observatory. The steel beams were stacked neatly on the south side and the weeds trimmed as shown:
Also, we worked on the demo pile on the west side. Recently the town dump changed one of its rules - all wood has to be cut to less than five foot lengths so I spent an hour or so doing that:
After it all got cut and stacked it didn't look so big anymore. Of course we have already made several trips to the dump over the winter plus we would carry some of the small stuff home and dispose of it. This weekend I brought home all of the old hanging ceiling panels.
Finally I'll end this blog with the last picture from the weekend - me posing at the north end of the observatory. San Diego is about eighty miles beyond the nearby ridge. 
Since our rainy season is done and virtually no rain will fall before August when the Arizona monsoon occasionally backs up into our area with thunder storms, I decided it was time to start on the outside, even though the roll off roof is not yet built. Here is a view of the south side of the observatory from a bit down the hill prior to power washing on Wednesday.
This was the easy part. The hard part is the same as last fall: I had to lay out four hundred and fifty feet of water hose up the hill to the nearest tap at the club observatory. To give a visual of that distance take a look at the picture below which is serving a dual purpose.
This was taken from the top of the hill by the water tap. Our observatory is on the left of the picture. The second purpose of this picture is in the distance. On the horizon beyond the ridge line is a darkish sky layer. That view is looking west toward the LA Basin but that is not smog. It is our infamous "marine layer". It is a deep, dense fog bank that hovers permanently over the California Current. The Current is a Gulf Stream-like ocean flow but coming down from Alaska and keeps the coastal water cold all year long - usually in the 60s. It helps to moderate the air temperature along the coast. The marine layer can be blown hundreds of miles off shore or up to a hundred miles inland. Its advantageous to us amateur astronomers when it rolls in at sunset. Under the best conditions, the marine layer covers the coastal cities and inland valleys up to 3,000 to 4,000 feet altitude, blocking all the artificial light and keeping the night sky where our observatory is located at 4,500 feet as dark as possible.
Phillis' room and my control room
View uphill of the south side of the observatory
In the above picture taken from the club's main observatory, John is on our roof installing flashing when not waving to the camera. You can also see the east wall partly tar papered. The other object is a storage container that is actually more than forty yards behind our observatory.
The roll off roof will be above John's warm room. 

As to the roof. Several weeks ago we decided that the method we have available for building the roof is somewhat dangerous and as a result have contracted the services of our club member who is a contractor and recently built the three observatories I featured in earlier blogs. The agreement is that John and I will complete the rail system on top of the observatory,. Gary, the contractor, will fabricate the roof from the wheels up. "Will" may not be the correct tense since earlier this week he updated us and said that he already has half of the roof trusses completed off site.

This is John's temporary pier in the southwest corner of the observing area. He has notched the concrete so that the pier feet can sit in the same place for several months. This will be the location of his permanent pier.
Inside the main warm room, we have removed the old fluorescent tube light panels and have replaced them with four of these newer and more efficient panels. John got them for free when renovators at his workplace miscalculated the lighting fixtures and ordered too many. They were going to throw them out when John appropriated them.
Now for today's work. I needed to secure the two interior wall sections to the cinder blocks walls with masonry screws. Then I had to make a brace to span the space for the pocket door kit. Remember that the top sill for each wall section simply butted together. I had to use the brace to splice them together. Then I assembled the pocket door kit - according to the directions which specifically said NOT to remove the small wood spacers that kept the integrity of the door frame during shipment. The problem for me was that I saw two of them - there was a third that I mistook for a strengthening piece. Suffice it to say that later when the kit was assembled, inserted into the space for it in the wall, plumbed and squared, and secured permanently with nails and screws - I realized there was a third spacer that was never mentioned or shown on the directions. This had been causing me problems in truing up the frame that I resolved with several extra houris of unnecessary difficulty. I realized it was a spacer when I removed the two obvious ones and hung the door. When I pushed the door into the frame, the door edge missed being flush with the frame side by about an inch. It should have slid all the way in and hit a rubber bumper on the far inside if the frame. The third spacer was blocking it. Since there were three screws holding the spacer and their heads were now covered by the 2 X 4s of the wall, I had to chisel out the spacer and then cut the protruding screws with a Sawzall. At that point I decided to call it a day. One unexpectedly favorable surprise saved us some work. We had anticipated that we would have to brace the middle of the wall against the rafters to keep it from moving but there is so much strength in the assembly that we can skip that step. Here is a picture of the finally completed wall in the main warm room:
This was taken looking west from near where the paved road gives way to the dirt road five miles from the observatory. The snow capped peak is Mt. San Jacinto. Just beyond and 7,000 feet below its peak lies Palm Springs at sea level. People normally see this mountain in the background of the Palm Springs postcards.



Its been keeping the rain out of the warm room.
Below is the west footing for the north rail support column, still in its form and not yet back filled:
Against the back wall are 4 X 4s of dry wall. I had to cut them down from 4 X 8s in the Lowe's parking lot to get them in my van. I provided some fine amusement for Lowe's customers that day. The new stud wall in the middle was built today. I made it into two separate sections as can be seen by the fact that the top sill are in two pieces. That was for two reasons: 1 - I was here alone today and would not have been able to lift and position a wall of that size myself; 2 - The top sill would have been 12 feet long - too long for my van. I did manage to position the two sections and bolt them to the cement slab floor. The empty center part of the wall is the roughed out area for the pocket door and its frame, both of which are leaning against the right hand wall beyond the new stud wall.
Just a quick explanation. The steel truss work pointing to the one o'clock position is actually what you would call the telescope tube. The mirror is almost 16 1/2 feet in diameter. Now look at the solid tube pointing at the 10 o'clock position in the foreground. It is hollow and I was able to climb inside of it last week. Here is my picture just inside the round entry portal:
I think this is enough for today. Since we are starting a new season at Palomar and I'm involved there with researching the observatory history and working on a telescope program in addition to conducting tours, I can provide a lot of interesting behind the scenes stories. Please let me know if you would like me to write about Palomar in addition to my observatory.