Monday, June 14, 2010

June 11 - 13

John and I spent two full days working on the observatory this past weekend plus we had the help of two of John's friends on Saturday to get some of the big steel pieces for the rail system up onto the roof.

I showed up late Friday afternoon, not expecting to get anything done that day but to be able to start almost at sunrise on Saturday. John came out the night before with the intention of imaging but he got clouded out. As it turned out Friday night got clouded out too and by 9 PM we were totally fogged in. It was so dark that if you stepped outside and took only a couple of steps and turned around, you could not see the observatory. A white door light less than fifty feet away did not even make a pale glow - it was completely invisible. We were fortunate because we recently added some things to the place to make it more comfortable. We now have a 36 inch flat screen TV (temporarily until I get a deal on a 46 inch one), a BlueRay player,and a microwave. So we ate popcorn, drank beer, and watched "When Worlds Collide" (one of the few good sci-fi movies from the '50s - and in color) then "2012" before we packed it in. I was able to bunk out in my room which is almost finished, and John slept in his warm room on the observing deck (which is almost completed also). At sunrise the cloud deck was less than several hundred feet up and quite thick, plus it was damp and only in the 50s. As is typical in the desert, within an hour of sunrise the clouds burned off, the sky was blue, the humidity dropped like a stone, but the temps stayed in the mid-70s all day with a light breeze.

Since we had two helpers showing up around 10 AM we were able to work on multiple projects at the same time. John double checked his autocad drawings for the rail and post support measurements while I went to work on what was left of the wood mold on the footings. If you remember, we struggled with that during the winter and decided to back off until the weather got warmer. Here's the east footing and the remaining wood mold:
I was pleasantly surprised because the wood had dried out so much over the winter that I was able to cut it easily and then break it out of the concrete with a sledge hammer. What I thought was going to be a several hour job turned out to be about thirty minutes. When I got the mold off the east pier I found that we had a neighbor:


The only reason I got such a close shot of him was because it was still pretty cool out and his body temperature was down so he could hardly move. Here's a shot of the north side with both footings completed and back filled.
I've just gone to live time now - at 9:26 PM on Monday evening as I'm writing this, we just had an earthquake - house gently swayed for about 15 seconds, pool water is rocking back and forth and almost overflowing - USGS just reported a 5.7 magnitude quake near the Mexican border, 118 miles south-southeast of here.

Okay, back to the important stuff. If your remember from last summer's blogs, I spent a lot of time sanding and priming the steel beams that we inherited from the former owners and were half buried for twenty years. We're finally starting to use them for the rail system. They're in terrific shape but many of the ends are just off being square. Here's a shot of John using a chop saw to even off the edge of one of the pieces that will be the wall cap and the base of the rail: That particular piece is a 2 X 6 about nineteen feet long and weighs around 200 pounds. The four of us managed to lift it and one for the other side up onto the roof. Once it was up on the roof and precisely positioned, we closely adjusted its level and extended it beyond the north roof line and over the west footing. John then hung a line down to where the post will attach to the top of the footing. The picture below shows John and his friend Roger taking some measurements. Derek is on the roof.
The measurement indicated that we were within 1/8 inch of our planned height. The other footing showed the same small difference. We were able to cut our lone 2 X 8 into the right lengths for both posts. Here's John cutting the 2 X 8:
One of the things that we have to do also that sounds minor but takes time is beveling the edges of the steel. That is to allow more contact area for when we butt the beam ends and have to weld them together. In the photo below, both posts are cut and stacked and you can see bright steel on their edges from the bevel grinding that we did. Actual measurement and cutting of the two rail posts were the major goals for the weekend. This gives John the information he needs to cut additional small steel plates and supports over the following, or current, week at home. Here is a picture from a different angle of the rails put in place for the post measurement: While these measurements were going on I was on the observing deck doing the very last of the demolition. We had left the 2 X 6 wood caps on the east and south walls through the winter and now they had to be removed to be able to place the rail system. They were originally bolted to the top of the cinder block wall with the nuts recessed into the 2 X 6. We couldn't figure how they originally screwed the nuts onto the bolts because there was virtually no room to get a socket wrench around the nut. I had to chisel some of the wood away to get enough room to work with. The picture below shows the observing roof area from last summer with all of the steel and wood support we had to remove. Compare that to the following picture taken last Saturday from a soemwhat different angle. You can see that the demo has been completed down to the cinder blocks. The bolts sticking up out of the wall need to be cut and then that wall is ready for the rail. This is also a good picture to show the observing area that I will be using. My area is a bit more than 9 feet wide and 17 1/2 feet long. The permanent pier for my telescope will eventually be about where the red vacuum cleaner is sited.

We had another adventure in desert biology. We took a break about 1 PM for lunch and sat around the front door of the observatory in front of my car. As we were eating, a five foot king snake slithered quickly across our driveway under the trunk of my car - no more than fifteen feet away. I was surprised at how fast it moved - I would not have been able to outrun it. Fortunately for us, the king snake leaves peopel alone and is immune to rattlesnake venom and loves to kill and eat them.

That pretty much wrapped up what we did on Saturday. We showered and went into town for dinner. By the time we got back we were getting pretty achy and tired but John went ahead and set up his equipment and automated it to image all night. I have a problem with working all day and then imaging all night so I just enjoyed the night sky for a while. It was a beautiful night with the summer Milky Way very bright and even some bright gas nebulae visible as well as the dark rift running down the center of the Milky Way. After a while I headed in and watched another '50s sci-fi classic - "Them" - yup, the one with the giant ants - and then went to sleep.

We did get interrupted with an earthquake at about 9 PM - a 4.9 twenty miles to our southeast. Things have gotten pretty active over the last year.

Sunday we got more done but we certainly were not at the pace of the previous day. We mostly policed the area around the observatory. The steel beams were stacked neatly on the south side and the weeds trimmed as shown: Also, we worked on the demo pile on the west side. Recently the town dump changed one of its rules - all wood has to be cut to less than five foot lengths so I spent an hour or so doing that:
After it all got cut and stacked it didn't look so big anymore. Of course we have already made several trips to the dump over the winter plus we would carry some of the small stuff home and dispose of it. This weekend I brought home all of the old hanging ceiling panels. Finally I'll end this blog with the last picture from the weekend - me posing at the north end of the observatory. San Diego is about eighty miles beyond the nearby ridge.

Friday, May 21, 2010

May 18 - 21 plus Palomar

Today's blog will be about the longest thus far so you might want to clear some time, curl up with a cup of coffee or tea, and get set for a fun read.

We're beginning our final push toward completing the observatory. John left for the observatory on May 14 for eight days; I went to the observatory on Tuesday, May 18. When I arrived the weather was miserable: low clouds, damp, and drizzle. Fortunately the rest of the week proved to be 70ish, dry, and light breezes. The optimal plan was to get as much work completed as possible so that by week's end the only major work remaining would be the rail system and the roll-off roof.

I had some back tracking to do. If you remember from the posts from last fall I power washed the outside of the observatory in anticipation of painting it with primer but the colder winter weather came early. (Notice I qualified the weather description with "colder" so as not to insult you Northeasters who tolerate REALLY cold weather. I'm only talking about temps down into the 30s at the lowest - only too cold for outdoor painting.) As a result, the winter rains caused the untreated cinder blocks to weep again as shown below.

Since our rainy season is done and virtually no rain will fall before August when the Arizona monsoon occasionally backs up into our area with thunder storms, I decided it was time to start on the outside, even though the roll off roof is not yet built. Here is a view of the south side of the observatory from a bit down the hill prior to power washing on Wednesday.


This particular spot from where this picture was taken has some recent notoriety. Last Saturday a four foot diamond back rattler was found and disposed of at this spot. This seems to be a harbinger of some change of wild life recently in our area. For the nine years I've been coming to this site through last summer, no rattle snakes had been found. Last summer, a member's Labrador retriever was bitten by a rattler; fortunately he survived thanks to some very quick emergency treatment. Now there was the one last Saturday. Then on Wednesday evening we saw a three foot rattler on a dirt road about 200 yards from our property gate. Three rattlesnake sightings in one year and none for the previous nine years seems to be saying something. Another change is a sort of symbiotic relationship between coyotes and desert hares. Desert hares are Eastern rabbits on steroids. They are typically the size of a very large cat and are the primary food source of coyotes. Suddenly this spring we are overrun with hares. They are virtually unafraid of people, roaming to within five feet of people while rooting. Why so many hares? There are hardly any coyotes. Typically at night you can hear literally dozens of coyotes howling once one starts up. This spring we've only been hearing a few at a time. Our guess is that the cause is the increase in permanent human habitation in the valley from two houses within eyesight several years ago to about six now. We're getting too settled for the coyotes in our opinion. The fourth change is the appearance of a rodent called the kangaroo rat. Although native to California and our desert habitat, we have never seen any at all in our valley. There are now at least half a dozen families living on our property. A different type of lizard has also appeared. The normal population are small speckled ones about 4 to 5 inches long. The ones who just moved in are dark and almost a foot long but much more shy the the smaller ones. That's more than enough desert biology for now.

On Wednesday I power washed the outside as planned. Here's a shot of me having fun.
This was the easy part. The hard part is the same as last fall: I had to lay out four hundred and fifty feet of water hose up the hill to the nearest tap at the club observatory. To give a visual of that distance take a look at the picture below which is serving a dual purpose.

This was taken from the top of the hill by the water tap. Our observatory is on the left of the picture. The second purpose of this picture is in the distance. On the horizon beyond the ridge line is a darkish sky layer. That view is looking west toward the LA Basin but that is not smog. It is our infamous "marine layer". It is a deep, dense fog bank that hovers permanently over the California Current. The Current is a Gulf Stream-like ocean flow but coming down from Alaska and keeps the coastal water cold all year long - usually in the 60s. It helps to moderate the air temperature along the coast. The marine layer can be blown hundreds of miles off shore or up to a hundred miles inland. Its advantageous to us amateur astronomers when it rolls in at sunset. Under the best conditions, the marine layer covers the coastal cities and inland valleys up to 3,000 to 4,000 feet altitude, blocking all the artificial light and keeping the night sky where our observatory is located at 4,500 feet as dark as possible.

After power washing the outside walls on Wednesday, I waited until Thursday afternoon to begin painting to give the blocks enough time to full dry out. Meanwhile there was plenty of time to do other work. On Tuesday I finished spackling the inside wall that separates Phillis's room from my control room. I had hoped to get the wall painted but ran out of time this go round.
Phillis' room and my control room

However, I also completed installing the ceiling panels in Phillis' room as well as most of my control room. I would have finished my control room ceiling except we made some last minute electric changes and had to run some additional conduit in the ceiling which we were able to complete. In the picture above, you can see through the pocket doorway into Phillis' room which is 7 feet by 11 feet, not very large but fine to hang out in at night with white light. Also, except for when Phillis is sleeping there, the door will be open to my control room which is 11 feet by 11 feet. At the very top of the picture you can see part of one of the ceiling lights. There are two in Phillis' room, two in my control room, and two in John's control room (which I'll get to shortly). We were very fortunate with light fixtures because they normally cost $400 each but John's work re-designed their offices and tossed out the light fixtures which we promptly appropriated.

By Friday noon I had finished painting the building. I left the north wall unpainted because currently we have materials stacked there plus we may add an attached shed there in the fall. Here are some pics of the completed paint job.


View above from the east or head of our driveway

View uphill of the south side of the observatory

We'll evaluate the quality of the coat in a week to determine if an additional primer coat is necessary but I'm betting that, at most, some touching up should be all that is necessary. The regular paint coat will follow and will include a NASA developed additive that I found. Its purpose is to reflect virtually all of the infrared light hitting the observatory. That should keep the inside cool and limit the cool down time in the evening when we open the roof.

The last thing we worked on was weed clearance. Normally, by the end of May we are required by our lease agreement to clear all brush for a distance of twenty feet from all structures for fire prevention and limitation. All annuals, especially grasses, have completed 90% of their growth by that time and start to dry out by then. They grow fast and can be up to four feet high before they start to dry out. Because of the new threat with the appearance of a number of rattlers, we cleared the grass for up to sixty feet from our observatory at some points. We just cut and drop the grass - within a couple of weeks it dries to powder and blows away.

While all this was going on, John was diligently working on building his warm/control room on the observatory level from the floor up. He built the walls and roof as modules at home and trucked them out to our site last Friday. By the time I showed up on Tuesday he already had the walls and roof assembled. The rest of the week he was running electrical conduit and lines and water proofing and paneling the outside walls. In the above picture taken from the club's main observatory, John is on our roof installing flashing when not waving to the camera. You can also see the east wall partly tar papered. The other object is a storage container that is actually more than forty yards behind our observatory.
By Friday John had his warm room almost completed.

The roll off roof will be above John's warm room.

In the picture below of the west wall, you can see part of John's warm room with a slanting upper west wall. That is to accommodate the roll off roof with a clearance of about two inches. On the top of the cinder block wall, you can see two metal plates, the beginning of the rail structure for the roof.


For almost a year now, you have patiently read about the observatory and seen only construction pictures. For the first time, below is a picture showing a sample of what the observatory is for - John's telescope equipment for imaging. Mine will remain at home until the roof is completed. The setup is temporary but is located where his permanent pier will be. With this equipment and his knowledge of astronomy and his imaging techniques, John is already talking astronomical pictures among the best in the world.


Here is a closeup of his equipment:

As to the roof. Several weeks ago we decided that the method we have available for building the roof is somewhat dangerous and as a result have contracted the services of our club member who is a contractor and recently built the three observatories I featured in earlier blogs. The agreement is that John and I will complete the rail system on top of the observatory,. Gary, the contractor, will fabricate the roof from the wheels up. "Will" may not be the correct tense since earlier this week he updated us and said that he already has half of the roof trusses completed off site.

On Saturday I drove down to Palomar from home to conduct docent tours of the 200 inch Hale telescope. There were only three fully fledged docents and four trainees so I ended up doing parts of three different tours. I ran into a novel situation. On one tour with about thirty people, one person insisted he had read about the telescope mirror being removed twenty years ago and taken to Cal Tech in Pasadena for re-figuring. In reality, the mirror has never left the mountain since it was delivered in 1948. The dilemma was what to say at this point since the gentleman insisted he was right but I didn't want the rest of the visitors to have incorrect information. What I did was hand him my email address and asked him to send me information - newspaper, Internet link, whatever - that I could use to confirm his story and relay that information to the Cal Tech and Palomar historians who must have been misinformed. That seemed to do the trick. Being docent is a fun thing to do, gets me up into the mountains, and frequently gets me access to the observatory at night, and actually got me an interview on BBC TV in 2005.

I hope you enjoyed this update as much as I enjoyed writing it. With luck, we will have first light by mid-summer.








Wednesday, April 14, 2010

April 14

Today was a very big day - all day. First of all, I was scheduled to do a tour for a group of high school students at Palomar Observatory at 10:30 so I headed out from home about 7:45. There are two ways of driving there. One is the coast route that takes the I-5 down to Oceanside and then east on Rte. 76. That's the shortest route at 82 miles; the second route is the inland route - over the Coast Range, down the I-15, and then east on Rte. 76 but that's 100 miles. That's the route I took this morning to avoid he commuter traffic into San Diego that can get bad very quickly as you get into the Oceanside area. I got to Palomar about 10 AM and met Scott, the PR director, and two other docents. I was just in time to hear a news announcement from Cal Tech - Palomar actually imaged several planets outside the solar system - this was the first time an actual disk of a planet was imaged rather than appearing as just a pinpoint like a star. So much for being only the 15th biggest telescope in the world. I was able to use handouts of the announcement as part of the tour in the morning. Then the students got something of a rare treat. While the tour was in progress maintenance work was going on with the wheels that turn the dome being lubricated. To lubricate all the wheels, the dome must be turned as each set of wheels become accessible at a service door. The students were able to not only see the dome turn from inside but they were able to go up on the catwalks, both inside and outside, and get a ride on the dome. Its a very strange feeling if you are on the inside catwalk because the dome turns so effortlessly that at first you think that the telescope in the center is turning and not you and the dome. You feel no motion or vibration. After the tour was over at 12:30 we did a quick recap at the docent center. Then we got the occasional perk we anticipate for volunteering for this work. Scott showed us a small file cabinet that was full of historical photos of the Observatory. They were all extra copies that he found in an old storage room and he told us to go through them and help ourselves!

By 1 PM I was ready to head over to my observatory at Anza. This was sort of a test ride for the future when I hope to drive regularly between the two places instead of always the long drive from home. From one place to another the distance is twelve miles as the crow flies. However, the actual drive involves driving down Palomar (which is actually a long elevated ridge rather than a mountain peak) and around the east flank of the mountain past Lake Henshaw and back west. That 12 mile straight line is actually a 60 mile, one hour drive! But at least its through beautiful country. In fact, the area around Lake Henshaw is quite surprising. Its a large flat grassy plain centered around the lake about 3,000 feet above sea level. For twenty miles I did not see one car in either direction. Finally about 2 Pm I got to my observatory.

John had accomplished quite a bit last weekend. He built the walls and roof for his warm room in the observing area and got as far as covering it with tar paper. My main task was to correct an error I made last week. You are going to laugh about this. Take a look at the picture below that I had in last week's blog:

Notice anything wrong? How about the red cement mixer in the back behind the wall I built that has a door too small for the mixer to pass through? I had to saw through the two studs to the right of the pocket door to get the mixer out. The only problem was that John had to take his Sawzall home and I had to make the cuts with a hand saw. Then I had to splice the studs and crossbraces back in place. That didn't take too long so I was also able to put up about 2/3 of the dry wall by about 6 PM. Then a two hour ride home.

So I got a lot done: the tour at Palomar, very rare historical feebies, the first test ride between the two observatories, and more construction work at my observatory.

Thursday, April 8, 2010

April 8 + Evening Planets

Last night I did a thirty minute talk at the Newport Beach Back Bay Center as part of three presentations by my club, the Orange County Astronomers. Although my talk, which was simply a display of astronomy images taken by club members was well received, the highlight of the evening as far as I was concerned was going outside after the first talk at about 7:40. The center is on the east side of Newport Bay so we had a great view across the bay of the western sky with just a band of sunset no more than ten degrees above the horizon. Just above this band was Venus, shining very brightly. It will be visible in the evening sky for several months. However, just the width of two fingers to the right and slightly lower was Mercury, which was much fainter - in fact almost 80 times fainter then Venus, and just barely visible to these aging eyes. If you would like to catch a view of Mercury - mostly for bragging rights because its really not that impressive - do it over the next couple of nights because Mercury moves very fast and will be moving apparently closer to the sun very quickly.
.
Today was a good day at Anza for me. Leaving home at 6:30 I got there in about 1 3/4 hours and avoided most of the commuter traffic. When I arrived there was another member out there overnight but I didn't see him, just his equipment on his pad and his car. He probably had a good night and slept most of the day in the bunk house.

My goal today was to at least finish the wall we've been working on but first, a picture update from last week. Here is the west footing that we've been working on forever. Half of the wooden mold has been removed. The fact that several inches of the mold are buried at the bottom of the footing in concrete is the main problem. Cutting and removing the mold is backbreaking work.


Here is the observing area, specifically the northwest corner. That is where John will be shortly building his own warm room - probably this coming weekend. He built the roof module at home and trucked it out to the site. It is sitting on top off the main warm room roof.

This is John's temporary pier in the southwest corner of the observing area. He has notched the concrete so that the pier feet can sit in the same place for several months. This will be the location of his permanent pier.


We also removed the old permanent pier since it was inefficiently placed dead center of the observing area. You can see it sitting on the right side in front of the blue tarp. I will be mounting that permanently on my side of the observing area. The wire disaster we found and I described last blog is hidden under the red cone in the center and partially blocked by the ARD (Automatic Rain Deterrent) - or the plain old plastic bucket - over John's pier. Inside the main warm room, we have removed the old fluorescent tube light panels and have replaced them with four of these newer and more efficient panels. John got them for free when renovators at his workplace miscalculated the lighting fixtures and ordered too many. They were going to throw them out when John appropriated them.
Now for today's work. I needed to secure the two interior wall sections to the cinder blocks walls with masonry screws. Then I had to make a brace to span the space for the pocket door kit. Remember that the top sill for each wall section simply butted together. I had to use the brace to splice them together. Then I assembled the pocket door kit - according to the directions which specifically said NOT to remove the small wood spacers that kept the integrity of the door frame during shipment. The problem for me was that I saw two of them - there was a third that I mistook for a strengthening piece. Suffice it to say that later when the kit was assembled, inserted into the space for it in the wall, plumbed and squared, and secured permanently with nails and screws - I realized there was a third spacer that was never mentioned or shown on the directions. This had been causing me problems in truing up the frame that I resolved with several extra houris of unnecessary difficulty. I realized it was a spacer when I removed the two obvious ones and hung the door. When I pushed the door into the frame, the door edge missed being flush with the frame side by about an inch. It should have slid all the way in and hit a rubber bumper on the far inside if the frame. The third spacer was blocking it. Since there were three screws holding the spacer and their heads were now covered by the 2 X 4s of the wall, I had to chisel out the spacer and then cut the protruding screws with a Sawzall. At that point I decided to call it a day. One unexpectedly favorable surprise saved us some work. We had anticipated that we would have to brace the middle of the wall against the rafters to keep it from moving but there is so much strength in the assembly that we can skip that step. Here is a picture of the finally completed wall in the main warm room:


Next week I will try to find a week day to complete the dry wall and start hanging the new ceiling panels. We're hoping to have an estimate on the new roof from Gary by then.

Sunday, April 4, 2010

April 4 + Easter Earthquake

Very interesting weekend!



First of all, nobody was injured nor was there any damage from the Easter quake. I'll add more after I update the observatory.



Yesterday both John and I worked at the observatory plus we had a meeting with the club contractor who just completed the other observatories that I've mentioned and shown photos of previously. No pics today - I'll have some next weekend after some more time at the observatory.



We met with Gary, the club contractor, at the observatory yesterday because we are getting a bit tired that our astronomy hobby has been transformed into a building contractor business with the completion seemingly not getting any closer. We are actually almost finished with all but two things: our telescope piers and the roof. We have almost completed all the electrical wiring including the installation of new ceiling lights in the warm room, almost completing the new wall and pocket door. We are half finished with removing the wood molds on our footings that we struggled with over the winter. Unfortunately they will not simply slide up and out of the hole, leaving behind the cement footings. What happened is that wet cement oozed under the forms and encased about three inches of the wood form in concrete. We have had to take a sawzall, squeeze it into the excavated holes, and try to saw thru the forms at an angle. Unexpectedly hard work half done. Then we finally removed the single telescope pier that's in the center of the observing area. I will be re-locating it several feet to one side for my use but we had a surprise, We expected to have one conduit coming up out of the slab to power the telescope. There were three conduits with wires coming out and simply twisted together and a nut slipped over each one - it really should have had a junction box but we finally figured out why three conduits - one came from the main circuit box as expected but the other two conduits run to the two GFI outlets on the outside of the building. Just some more unexpected electrical wring to do.

We met with Gary to see if we can have him help with the roof. After reviewing our autocad drawings and discussing his schedule versus our needs and finances, we will be getting an estimate from him with ten days. He will price it two ways: one - he will complete the entire roof assembly including all of the rail and support work on top of the walls, and two, we will complete the track and support system and Gary will quote only on the roof itself. In both cases, John and I will complete the roof motor mechanism. Hopefully, Gary will be reasonable time-wise (completion by late June) and price-wise (he usually makes nothing on club members and if he under estimates the job, he eats the difference). Meanwhile John and I will continue with the projects we have already initiated, Fortunately, despite the lack of a roof and no permanent piers, the observatory is usable.

You probably have heard about the big quake across the border in Mexico today. Phillis and I were at a friend's house in Huntington Beach sitting down for Easter dinner on his patio when it hit. There were eight of us sitting by the pool when I started to feel a slight side to side motion, minor enough to think it was just my balance. I asked Phil if she felt ti and then it got stronger and everyone felt it. Every quake feels different and this was the most different. It lasted av bout 45 seconds and the motion was a back and forth motion that got fairly strong and then tailed off and then another set of motion with a different period and less strong. When it was over I said it was at least a 7.0 at least a hundred miles away. Just like in the movie "Volcano" - all Californians get into the quick guess before they hear official word. Right now it was a 7.2 almost 140 miles away. This was the first reasonable quake we experienced when it wasn't night and we were outdoors. The pool water sloshed over onto the patio and lost a couple inches of water. It was really cool watching the utility poles swinging back and forth one at a time as each quake wave came thru. I thought the wires were going to snap because they would lose tension and then get very taut every few seconds.

The funny thing was people's reactions. Six of us have felt a number of fairly strong earthquakes so once it was over, talk switched over to talking about past quakes. The two visitors from North Carolina were on the verge of panicking unit they saw how calm we all were. The quake talk went on for about ten minutes and then switched back to other things. When we went inside the TV had a continuous bulletin about the quake but we knew it would be hours before anyone knew anything more than how strong was the quake and where was the epicenter. The visitors were glued to the TV. I was very interested to hear one of the old timers recall when he was ten years old and went thru the Long Beach quake - in 1933!

That's about it until next week.

Thursday, March 11, 2010

March 11

Today was a good day at the observatory. As promised some time ago, here are the pics to catch up on the work I've written about. First a pretty picture:This was taken looking west from near where the paved road gives way to the dirt road five miles from the observatory. The snow capped peak is Mt. San Jacinto. Just beyond and 7,000 feet below its peak lies Palm Springs at sea level. People normally see this mountain in the background of the Palm Springs postcards.
Most of the dirt road has been repaired since the last rains two weeks ago except for the final approach to our gate, which actually is considerably worse for some reason.

This rut is almost a foot deep and runs all he way to our gate, splitting along the way. The best way to cross this is to try and pass over it at a 90 degree angle - as long as the sides don't collapse!

Here's an axle buster!

Now for the catch-up pics. Here is the outside view with the new stains and weeping from the rain:

East wall:


South wall:

The walls will have to be power washed again prior to painting in a few weeks.

Here is the new door between the warm room and the observing area:

Its been keeping the rain out of the warm room.

Below is where we replaced the window between the warm room and observing area. This will be covered in a few weeks by the wall from John's warm room.Below is the west footing for the north rail support column, still in its form and not yet back filled:

Below is the warm room as of today. The old ceiling tiles have been removed. The new tiles are in cases on the left. The white squares piled in the back middle are the new lights that will replace the old fluorescent lights. There will still be both white and red lights on different on/off switches. The red lights are used at night to maintain your night vision.
Against the back wall are 4 X 4s of dry wall. I had to cut them down from 4 X 8s in the Lowe's parking lot to get them in my van. I provided some fine amusement for Lowe's customers that day. The new stud wall in the middle was built today. I made it into two separate sections as can be seen by the fact that the top sill are in two pieces. That was for two reasons: 1 - I was here alone today and would not have been able to lift and position a wall of that size myself; 2 - The top sill would have been 12 feet long - too long for my van. I did manage to position the two sections and bolt them to the cement slab floor. The empty center part of the wall is the roughed out area for the pocket door and its frame, both of which are leaning against the right hand wall beyond the new stud wall.

By next week John will have completed most of the new wiring and I will have completed the new wall. John will also start on his warm room in the current observing area. Within the next month my new camera will arrive and I will start the shake down on my new system. That will get me to the point of coming out for a long weekend where I can work on the observatory, take images and photometry at night, and do afternoon tours at Palomar Observatory, only forty minutes away.

Speaking of which, I was at Palomar last weekend and was snowed on for the first time in California. I got a chance to climb inside part of the telescope. To get an idea of what I'm talking about, here is a standard picture of the Hale telescope at Palomar:

Just a quick explanation. The steel truss work pointing to the one o'clock position is actually what you would call the telescope tube. The mirror is almost 16 1/2 feet in diameter. Now look at the solid tube pointing at the 10 o'clock position in the foreground. It is hollow and I was able to climb inside of it last week. Here is my picture just inside the round entry portal:

I think this is enough for today. Since we are starting a new season at Palomar and I'm involved there with researching the observatory history and working on a telescope program in addition to conducting tours, I can provide a lot of interesting behind the scenes stories. Please let me know if you would like me to write about Palomar in addition to my observatory.

Thursday, March 4, 2010

March 4

This will be short. If you've had a bad day, read on - you may feel better since I probably had a worse day then you. If you've had a good day, skip this so I don't ruin the rest of your day. Don't worry, I don't have the new pictures I promised in the last post. That will wait till next week.

Today's trip to Anza had been delayed repeatedly over the last two weeks, mostly due to weather. I had the van pretty loaded up for today's trip: 18 2"x4"s, five pieces of 4'X8' sheet rock, a pocket door frame, a pocket door, 3 cases of ceiling tiles, plus all the tools I needed. All of this was to divide the warm room into a control area/TV room and a separate sleeping area and to replace the old ceiling tiles I ripped down ages ago.

I had some trepidation because I heard the dirt road to the site had taken some hits with the last rains. Under normal conditions the van barely has enough clearance; today it was even less with the load I had.

The road was eroded in a few places but had been repaired better than before in others. Despite the improved areas, the normal ten minute dirt road ride took over 30 minutes. Here's a pic of the road with one of the deeper eroded ruts:
The final approach to our site was in the worst shape. Some of those ruts are over a foot deep. The entrance to our site is just past the fence on the right.
The weather had changed quite a bit from the coast - from warm and sunny to cool, cloudy, and damp. A good thing was that even though it had rained quite a bit recently, the warm room was dry as a result of the new door and weep holes we drilled several weeks ago.

I had everything unloaded and in the observatory by 9:30. I should have easily been able to frame out the wall and door, put up the sheet rock, and hung the ceiling tiles by dinner time - not to be. The gods needed to be amused.

I opened up the pocket door kit to start to review the assembly directions. I couldn't find the bag of hardware for the assembly. The packing box had not been tampered with but there was no bag in the van or the observatory. I was stuck before I could do anything. The nearest Lowes was over 35 miles away; the one that I bought it at was over 90. That pretty much killed any hope of construction for the day. I resigned myself to rectifying the problem and trying again next week.

I got home by noon, got my Lowes receipt and headed to the store. The manager became very understanding once everyone in the store could hear of my problem and the wasted day. He reimbursed me $50 of the $60 cost of the door. So I made $50 for half a day's work minus the gas.

I'll try again next week and will hopefully have a happier story to tell.